VIBCO
In May of 2009 a team of VIBCO's service technicians made several trips to Ground Zero, the site of the World Trade Centers in New York.
The objective was to assist Navillus Contracting set up VIBCO Vibrators to ensure perfect consolidation of concrete for the Memorial Wall.

Below are links to 360ยบ Panoramic images of the site with Vibco Vibrators on the forms. To navigate the image simply click and drag the image around, up and down.

Preparation

On The Road
Early stages of the wall forming
Behind the Wall - Doka Frami Forms
Vibrator Testing - custom brackets, pneumatic Vibrators
Lunch Break
Supplies stacked near the wall
City Skyline, top of the hole near elevator/stairs
Leaving the site

VIBCO Techs

Day of Pour

Completed wall forms
Vibrators installed - waiting
US-1600 Vibrators on Doka Framax Xlife Forms
Tall wall forms
In the sunshine
Running the electrictricity
Final wiring
Ready for the pour

Shots from the day of the pour. Vibrators awaiting concrete - On top of the form - Cutting rebar